Transformers, machinery and long steel sections on low-bed, semi low-bed and hydraulic axle trailers. Every move starts with a written route survey, then permits, escorts and a crane at site, all planned by one team.
Route survey before we quote
If any one of these is true, the load is over-dimensional and needs a planned move, not just a bigger truck.
2.6 m
The legal width of a goods vehicle on Indian roads.
3.8 m
Measured from the road to the top of the load, not the deck.
12 m+
Or heavier than the legal axle load of a normal trailer.
Lower deck means more height for the load. More axle lines means more weight within the legal limit.
Nothing moves until the route survey is signed off. That is what keeps a 60 tonne load from meeting a weak bridge at 2 am.
You share the general arrangement drawing, weight, centre of gravity and lifting points.
Our team drives the route and measures bridges, overhead wires, gantries, junctions and diversions. You get a written report.
The trailer, axle lines and lashing points are chosen so the load sits within legal axle weights.
Movement permits from each state on the route, and police or utility support where wires must be lifted.
Pilot and chase vehicles, movement only in permitted hours, and a call to you at each state border.
Crane or jack-and-slide coordinated with your site team. The POD is signed once the load is set down.
Typical sizes are a guide. Send the drawing and we will tell you the trailer and route that fit.
Tall, heavy and centre-loaded. Usually low-bed or hydraulic axle with a full route survey.
Long round pieces that need cradles, careful lashing and wide turns at junctions.
Excavators, rollers, cranes and pavers, driven or lifted onto a low-bed.
Long sections on extendable trailers, with escorts for the turns.
Compressors, gensets, presses and skid-mounted units moving between plants or to a new site.
Girders, trusses and fabricated sections for bridges, sheds and industrial buildings.
Send the drawing, weight and site addresses. We come back with the trailer, the route and a survey date.